- Dry construction technique
- 50% faster than traditional masonry construction
- Lead in time is generally 13 weeks from the order, or frozen design, whichever is the later to commencement of the ring beam
- Buildings with floor areas up to 1000 sqm are on average constructed with a cycle time of 3 weeks for the first storey and 2 weeks per floor thereafter
- Pre-engineered components ensure an accurate structure
- Ability to incorporate concrete floors
- Flexibility to incorporate most cladding systems
- Offsite fabrication of wall panels
- Erection rarely hampered by weather
- Inert frame producing no settlement allows external masonry leaf to commence immediately behind window installation
- Rapid dry envelope, allowing early commencement of dry lining and non-load bearing partitions, first fix MandE services
|
Further information
|
|
-
Metsec Plc is now on Facebook.
Click here and follow us »
-
Metsec are the first manufacturer in the UK to CE mark its Purlin and Framing Systems...
more »
-
The new SFS FrameSPEC version 5 is now available..
more »
-
New higher strength purlins reduce structure weight..
more..»
-
Metsec Steel Framing System cuts construction costs by up to 39%..
more..»
-
Metsec's new slotted head - "the way forward"..
more..»
|
|