02 Arena, Greenwich, London
With the completion of the O2 complex on the Thames waterfront in Greenwich, London now has what it has always needed: a world-class entertainment destination. The first purpose-built music venue since the Royal Albert Hall in 1871, the O2 now hosts an unbeatable line-up of international stars, and will stage major sporting events including the 2012 Olympics..

Metsec’s provided the design and detailing for the infill walling along with the material supply to complete the infill walling supporting the external facades on all seven of the new buildings around the arena area.

Mark Nixon, Projects Director for WRR (UK), said: "With just 26 weeks for seven complete buildings, we appreciated the speed and simplicity of the SFS system. It was also very useful to be able to draw on Metsec’s excellent technical support, and help with refining architects’ drawings and specifications."


Back To Hotel - Case Studies List

Metsec plc. Company Number 1551970 (England)   Registered Office: Broadwell Road, Oldbury, West Midlands B69 4HF.